With help from Sam and his loader we set the 14 ft base on it's concrete footer. This Beast of a machine was the only way to handle the 3800 lb metal tube. The dome will rest on the top with a warm room attached to the side at the upper level.
Sunday, September 14, 2008
Subscribe to:
Post Comments (Atom)


No comments:
Post a Comment