With help from Sam and his loader we set the 14 ft base on it's concrete footer. This Beast of a machine was the only way to handle the 3800 lb metal tube. The dome will rest on the top with a warm room attached to the side at the upper level.
Sunday, September 14, 2008
Setting The Base
With help from Sam and his loader we set the 14 ft base on it's concrete footer. This Beast of a machine was the only way to handle the 3800 lb metal tube. The dome will rest on the top with a warm room attached to the side at the upper level.
Doorway To The Stars
Domes First Daylight
Subscribe to:
Comments (Atom)



