Sunday, January 4, 2009

THE DOME IS HOME


The dome is in place and the structure is sealed up and ready for winter.

IN PLACE


The dome is an inch from being in place. We removed the 2x4 slide and nudged it into place.

LIKE BUILDING A PYRAMID


Once again my nephew Harley lends a valuable hand. We slid the 250 lb + dome up an improvised ramp then muscled it onto the tank structure.

INSIDE THE DOME SUPPORT TUBE


Liana has framed the inside of the tank and constructed an isolation tube around the telescope pier.
This also acts as a support for the second floor. She constructed a series of three trap doors that when closed provides a 360 degree access to the scope.

WARM ROOM FRAMING


Warm room floor has been poured and the wall's and roof framed . This is an unique structure , so we opted for a heptagon shaped room.